Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | 24 Month |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Size | φ160*440*2.5m (cathode outer cylinder) |
Size | φ50*440mm (anode tube) |
Water treatment capacity | 60m³/Hour |
Coating area | 0.069m² |
Working current | 4A |
Operating voltage | 36V |
Operating temperature | 10~40ºC |
Bacterial rate | 80%~95% |
Current density | 55-60A/m² |
weight | 4.5Kg |
Cable length | 8 meter |
Matching power supply | 36V/37.5A |
Circulating water scaling electrode:
1. The principle of electric scaling removal;
By loading direct current to the electric scale removal, the dissolution ability of the circulating water to the scale forming substances is improved, and the attached scale in the water of the cooling circulating water system is gradually dissolved. At the same time, oxygen free radicals and ozone are generated during the anode electrolysis process, which further strengthen the disinfection effect of the reaction and the entire water system, and are discharged to the outside of the circulating water system together with drainage.
2, The application industry as follows;
A, central air conditioning circulating water system
B, Cooling tower circulating water system
C, Injection molding machine cooling circulating water system
D, waste oil water-cooled air pressure circulation system
3, Current density 55-60A /M² supporting power supply: 36V 37.5A
A, Low current can obtain a softer scale
B, The aragonite content of 69.37% (soft scale) in low current scale is greater than that of 30.63% (hard scale) in high current scale
C, Low current can make the hardness of water decline rate greater than high current, it is easier to make the generated calcium carbonate scale easy to remove.
D, Reduce energy consumption.
4, Circulating water descaling time;
A, Current 23A, Cleaning time 5-7 days
B, Current 15-23A, Cleaning time 10-15 days
C, Current 9-23A, Cleaning time 20-30 days
D, Current 2-8A, Cleaning time 40-50 days
Our factory located in Baoji, China's titanium industry base, with a strong R & D team and production capacity.
Efficient to provide customers with customized services.
Question 1: We are very satisfied with this product. Can I customize my logo on the product?
Answer 1: Of course. We offer customized services.
Question 2: I want to adjust the size of this product to meet our needs, can you meet it?
Answer 2: Yes, this exhibit is our standard, it's only for reference. Please provide your specific requirements or drawings, we will customize for you.
Question 3: What's the lead time for this product?
Answer 3: 3-5days.
Question 4: What's the lead time for customization?
Answer 4: Sample delivery time of fixed products: 3-5days. Mass production delivery time: 21-30 days.