Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | 24 Month |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Size | φ160*440*2.5m (cathode outer cylinder) |
Size | φ50*440mm (anode tube) |
Coating area | 0.069m² |
Operating temperature | 10~40ºC |
Microbial Control | >95% sterilization |
Cable length | 8 meter |
Matching power supply | 36V/37.5A |
Titanium Electrode Mesh Barrel, Ru-Ir Coating + Optimized Electrode Architecture - Redefining Efficient Descaling
Empower Water Systems with Next-Generation Longevity
I. Technical Specifications: Precision Engineering for Industrial Demands
Parameter | Value |
Operating Current | 4A (Adjustable via Smart Control) |
Operating Voltage | 36V DC (±5% Tolerance) |
Flow Rate Capacity | 60 m³/h (Scalable via Modular Design) |
Current Density | 55-60 A/m² (Optimized for Ru-Ir Catalysis) |
Weight | 4.5 kg (Compact & Easy to Install) |
Recommended Power Supply | Dedicated High-Frequency PWM Power Supply |
Metric | Conventional Systems | Ti Electrode Mesh Barrel |
Descaling Efficiency | 60-75% | >95% |
Flow Rate per Unit | 30-40 m³/h | 60 m³/h |
Maintenance Cost Reduction | 20-30% | 54.3% |
Microbial Control | Chemical-dependent | >95% sterilization |
Energy Consumption | 150-180 W/m³ | 90-110 W/m³ |
VI. Client Testimonials: "This is True Innovation!"
***Semiconductor Manufacturer: "Cooling water hardness dropped from 300 ppm to 15 ppm, boosting wafer yield by 2%!"
***Hotel Chain: "Zero hot water system failures in 3 years - ROI achieved within 8 months!"
***Chemical Plant: "54.3% maintenance cost reduction - no more chemical procurement headaches!"
Our factory located in Baoji, China's titanium industry base, with a strong R & D team and production capacity.
Efficient to provide customers with customized services.
Question 1: We are very satisfied with this product. Can I customize my logo on the product?
Answer 1: Of course. We offer customized services.
Question 2: I want to adjust the size of this product to meet our needs, can you meet it?
Answer 2: Yes, this exhibit is our standard, it's only for reference. Please provide your specific requirements or drawings, we will customize for you.
Question 3: What's the lead time for this product?
Answer 3: 3-5days.
Question 4: What's the lead time for customization?
Answer 4: Sample delivery time of fixed products: 3-5days. Mass production delivery time: 21-30 days.