After-sales Service: | Yes |
---|---|
Warranty: | 24 Month |
Type: | Microfiltration Machine |
Method: | Chemical Treatment |
Usage: | Industrial, Home, Agriculture, Hospital, Ballast Water Treatment |
Electrode Combination: | Anode *5 + Cathode *6 |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
The principle of electrode method is to produce sodium hypochlorite by non-diaphragm electrolysis through homogeneous secondary chemical reaction. The reaction principle of the anode is the electrolysis of sodium chloride (tablets) thrown into the swimming pool. In the electrolysis process, sodium hypochlorite is formed. The more suitable salt concentration is 3%-5%. The electrodes used in the sodium hypochlorite generator are plate electrodes and tube electrodes.
The anode material can be coated titanium electrode. Mixed oxide coated titanium anode has long service life, low overpotential, high chlorine evolution current efficiency and good energy saving effect.
Electrode combination | anode *5+ cathode *6 |
Electrode size | 110mm*50mm*1.0mm |
Electrode combination weight | 0.35Kg |
Shell + electrode combination Size | 300mm* width:150mm |
Shell + electrode combination weight | 0.90Kg |
Working current | 25A |
Operating voltage | 10V |
the amount of chlorine produced per hour | 50g |
Our factory located in Baoji, China's titanium industry base, with a strong R & D team and production capacity. Efficient to provide customers with customized services.
Question 1: We are very satisfied with this product. Can I customize my logo on the product?
Answer 1: Of course. We offer customized services.
Question 2: I want to adjust the size of this product to meet our needs, can you meet it?
Answer 2: Yes, this exhibit is our standard, it's only for reference. Please provide your specific requirements or drawings, we will customize for you.
Question 3: What's the lead time for this product?
Answer 3: 3-5days.
Question 4: What's the lead time for customization?
Answer 4: Sample delivery time of fixed products: 3-5days. Mass production delivery time: 21-30 days.
Suppliers with verified business licenses